Knowledge Center

Home / News / Knowledge Center

Installation guidance video of Powder bottle filling machine

Feb. 01, 2023

        Installation guidance video of Powder bottle filling machine

Assembling & Operation guidance for Powder bottle filling line

Before you star the mass production. You’d better follow up our guidance step to operate your machines.

                        

        Step 1 Assembling the conveyor belt for the entire bottle filling line.


        Step 2: Operate bottle feeder

        Installation guidance video of Powder bottle filling machine

        As its packed entire one. so no need to assemble it. Just need to follow up the below video link to adjust the shelf to meet your bottle dimension. Remark: Pls note that only available for Round bottle.


        Step 3 :Assembling auger feeder

                Installation guidance video of Powder bottle filling machine        

        There are two units of auger feeders in this packing solution. Do the same way to install the screw auger to the tank .Pls refer to this video:

        Step 4: Connecting the wire of first auger feeder to Powder mixer

        Connect the wire of first auger to the correct position as per the mark number of wire.Such as U2.V2.W2.

        There is a detecting sensor fixed on the top of mixer.once lack of the powder inside of mixer. Then sensor will give signal to the Intermediate relay and control the timing relay to control the contactor to switch on the power of U2.V2.W2 to feed powder by auger feeder

        Pls refer to the below picture of: “Electrical box of powder mixer” about the working principle.

Installation guidance video of Powder bottle filling machine

        Working process of auger feeder and powder mixer 

Installation guidance video of Powder bottle filling machine

        Step 5: Connecting the wire of second auger feeder to the powder bottle filling machine.

        The second auger feeder comes with the plug with pin. Such as 3 pin or 4 pin. You only need to connect the plug to the powder filling machine directly. The auger feeding working principle.like as the first auger feeder. Once lack of powder inside of metering device.then auger feeder will feed material automatically.

Installation guidance video of Powder bottle filling machine

        Step 6 Install the capping machine

        Just need to connect the vibrator with the gap feeder shelf by screws. Kindly check the following picture for your reference.

Installation guidance video of Powder bottle filling machine

        

      Operation 

        Step 1:Operating powder filling machine

        Installation guidance video of Powder bottle filling machine


        

        No matter you are using the powder filling machine with single filling head or double filling head,you can do the same way to adjust the machine. It will show you how to change the filling capacity as well. Before you run it under automatic filling system.Its better to trial it under manual filling system.

        Password of touch screen: 888888

        based on this video:

        Step 2: Operating Labeling machine

        How to install the label roller. Please refer to the video: 

Installation guidance video of Powder bottle filling machine

        No.1:Roll label go out one by one    No.2:Bottle separate device to make bottle run one by one

        No.3:Label waste paper recyle      No.4:Adjustable handle to adjust label head easily

        No.5:Sensor to detect bottle coming then machine labeling

        No.6:Clamp bottle for higher labeling accuracy.

        No.7:Touch screen

        No.8: Imported Sensor to detect the label

        LANDPACK would be your reliable supplier of packing machine.


Hot Products